- Home
- Industries
- DiGA development
DiGA development, from concept to the directory
A DiGA is a digital health application that doctors in Germany can prescribe and statutory health insurance reimburses. Getting listed means meeting strict requirements. We build products that meet them by design.
- Built and listed
- Edupression, an approved DiGA
- Security audit
- BSI TR-03161 passed
- Delivered by
- 15 people in 11 months

What is a DiGA?
A DiGA (Digitale Gesundheitsanwendung) is a digital health application that doctors and psychotherapists in Germany can prescribe and statutory health insurance pays for. To be listed in the DiGA directory run by BfArM, it must be a CE-marked medical device and prove safety, data protection, information security, interoperability and a positive care effect.
How long does it take to get a DiGA listed?
BfArM decides within three months of a complete application. If the positive care effect is not yet proven, a DiGA can be listed provisionally for up to 12 months while a study runs. Building the product comes first: Edupression's app, backend and tools took our 15-person team 11 months.
Read the Edupression case studyWhat BfArM looks at, and what we build for it
BfArM, the German Federal Institute for Drugs and Medical Devices, reviews every DiGA application. These are the areas it examines and the work we do for each.
Safety and functionality
Software development and documentation that supports your quality management system and technical file as a CE-marked medical device.
Data protection
GDPR-compliant architecture, consent flows and records of processing, with hosting in Germany or the EU.
Information security
Security designed to BSI TR-03161, with evidence prepared for the testing lab and fixes through to certification.
Interoperability
Data export and exchange using HL7 FHIR and the formats the DiGA rules require, including ePA export.
Quality, usability and accessibility
Patient-tested design, accessible interfaces and robust QA across devices.
Positive care effect
Analytics and data pipelines that support the study proving your product helps patients.
How we take a DiGA from idea to listing
Each stage produces software and the documentation you need for the next one.
Readiness check
Gap analysis against DiGA and BSI TR-03161 requirements, and a plan for the route.
Design with patients
Prototypes tested with people from the target patient group.
Build to the rules
Sprints with security, privacy and interoperability built in and documented.
Audit and apply
Evidence for the testing lab and the technical details your BfArM application needs.
Run and improve
Releases, security updates and evidence collection after listing.
Regulatory advice on the route to listing comes from our partner DiA42, so engineering and regulatory work move together.
Regulatory partnerDiA42Our regulatory consultants for the German market.
Edupression: an approved DiGA we designed and built
A CE-marked therapy app for depression, secured to BSI TR-03161 and used by 10,000 patients.
DiGA questions
Can you help if our product is already built?
Yes. We start with a gap analysis against DiGA and BSI TR-03161 requirements, then fix what is needed. Often that is faster than rebuilding.
Do you handle the BfArM application itself?
The application is made by you as the manufacturer. We provide the technical documentation, security evidence and product details it needs, and work alongside your regulatory advisors.
Do you write the clinical study?
No. Study design belongs with your clinical and research partners. We build the product features and data collection the study depends on.
We are a UK company. Can we enter the German market?
Yes, many DiGA manufacturers are based outside Germany. We help you plan the product for both markets, so the work you do for NHS buyers and for BfArM overlaps as much as possible.
What happens after listing?
Requirements keep changing and your product will keep evolving. We can stay on as a dedicated team to handle releases, security updates and evidence collection.
How much does DiGA development cost?
It depends on the platforms, which parts of BSI TR-03161 are in scope and how much of the product already exists. We start with a readiness review, then give you a fixed-price estimate for each stage, so you know the cost of the whole route before you commit.
Which parts of BSI TR-03161 apply to a DiGA?
Part 1 covers mobile apps, part 2 web applications and part 3 the backend systems behind them. Most DiGA have at least two of these in scope. Our BSI TR-03161 guide explains each part.
Get a DiGA readiness review
Share your concept or current product. We will tell you what stands between it and the directory.
NDA available before you share details