Skip to content
  1. Home
  2. Industries
  3. NHS and UK

NHS digital health software, built for DTAC

Before an NHS organisation buys or deploys your product, it checks clinical safety, data protection, security, interoperability and usability. We build the product and its evidence together, so procurement does not stall on paperwork.

Westminster and Big Ben in London at dusk
In short

What is NHS DTAC?

DTAC, the Digital Technology Assessment Criteria, is the baseline NHS organisations in England use to assess digital health technologies before buying them. It covers clinical safety, data protection, technical security, interoperability, and usability and accessibility, and suppliers answer it with evidence such as a DCB0129 safety case and a DSPT submission.

Read our NHS DTAC guide
Good to know

What is DCB0129?

DCB0129 is the clinical risk management standard for manufacturers of health IT used in the NHS. It requires a documented clinical risk management process, a hazard log and a clinical safety case report, overseen by a Clinical Safety Officer who is a registered clinician. Deploying NHS organisations follow its partner standard, DCB0160.

NHS DTAC

The five areas NHS buyers assess

The Digital Technology Assessment Criteria (DTAC) are how NHS organisations evaluate digital health suppliers. Here is what we build for each area.

Clinical safety

Clinical risk management to DCB0129: hazard log, safety case and evidence, prepared with your Clinical Safety Officer. We also support NHS organisations deploying under DCB0160.

Data protection

UK GDPR by design, data protection impact assessments, and support for your Data Security and Protection Toolkit submission.

Technical security

Secure architecture, penetration-test readiness and controls aligned to Cyber Essentials and OWASP, with hosting in UK regions where needed.

Interoperability

HL7 FHIR and FHIR UK Core, NHS login, and integration with NHS APIs and clinical systems where your product needs them.

Usability and accessibility

WCAG 2.2 AA, the NHS service standard and design patterns patients already recognise, tested with real users.

Beyond DTAC

Where your product is a medical device, we work to IEC 62304 and support your MHRA registration and UKCA route. We also build the data collection behind NICE evidence standards.

The route

From idea to NHS procurement

The same five stages we use for DiGA, tuned for UK assessments.

  1. DTAC gap analysis

    Every criterion mapped to features, tests and documents, with gaps ranked.

  2. Design with patients and staff

    Prototypes tested with patients and NHS staff who will use the product.

  3. Build with a safety case

    Sprints that update the hazard log and security evidence as features ship.

  4. Assure and submit

    Penetration testing, DSPT support and a complete DTAC pack for buyers.

  5. Deploy and support

    Rollout support for NHS organisations and a team that keeps evidence current.

One product, two markets

Plan once for the NHS and the DiGA directory

DTAC and DiGA ask similar questions in different words. Planning for both in discovery means one architecture, one security approach and shared evidence, instead of two parallel projects.

  • Security work reused across BSI TR-03161 and UK assessments
  • One FHIR data model for NHS systems and German ePA export
  • GDPR and UK GDPR handled in one privacy design
Two doctors reviewing information together
FAQ

UK questions

Do you provide a Clinical Safety Officer?

DCB0129 requires a Clinical Safety Officer who is a registered clinician on the manufacturer's side. We work alongside yours and prepare the hazard log, safety case and evidence they review and sign off.

Can you help if we already have an NHS pilot?

Yes. We review the product against DTAC and the pilot organisation's requirements, then close the gaps before wider rollout.

Where is data hosted for UK products?

In UK cloud regions by default for NHS work, agreed with you at the start of the project.

Is our product a medical device?

That depends on its intended purpose, and the decision belongs with you and your regulatory advisors. We help you understand what each answer means for the software and documentation.

How long does it take to prepare for DTAC?

It depends on how much evidence already exists. A product built with clinical safety and security in mind from the start needs mostly documentation; an older product may need changes first. A DTAC gap analysis ranks the gaps and estimates each one.

Does DTAC apply in Scotland, Wales and Northern Ireland?

DTAC is published by NHS England for organisations in England. The other UK nations run their own assessments, which ask many similar questions, so the same evidence is usually reusable. We confirm what each buyer requires.

Next step

Selling to the NHS?

Send us your product or concept. We will show you what DTAC will ask and what to build first.

Request a DTAC review hello@devellumtech.com Reply within two working days
NDA available before you share details